Track is down & Running trains!
By Brian Donovan on May 29, 2006 | In Main category, C&A Railway Construction | Send feedback »
Track was laid and the power supply hooked up. I’m running track power with a Crest Ultima 10 amp power supply with a splitter to two Crest 10 amp controllers (1 for each loop). Some pics of running trains -



-Brian
Feedback awaiting moderation
This post has 1 feedback awaiting moderation...
Leave a comment
| « Building the C & A Railway | C&A Structures » |
